Driftwood capturing works that can be retrofitted to existing impermeable sabo dams

Main construction method for capturing driftwood that can be retrofitted

  • Adding the ability to capture driftwood to existing dams
  • Excellent driftwood capture
  • Excellent installability
  • Simplifies maintenance work

Features

Adding the ability to capture driftwood to existing dams

Installing the steel slit on the upstream side of those impermeable sabo dams often found across Japan, improves the functions of existing dams through added ability to capture driftwood.

Excellent driftwood capture

Reliably captures driftwood with its permeable structure of steel pipes. The excellent capture performance has been proven in actual results.

Excellent installability

Because the steel slit is installed on the upstream side of the existing impermeable dam with a retrofitting anchor, hardly any modification is required on the existing dam.

Conforms to the Design Guide for Overhanging Driftwood Capturing Works

The steel slit is designed in accordance with the "Guidance for Designing Overhanging Driftwood Capturing Work" published by the Sabo & Landslide Technical Center, addressing driftwood disasters which are becoming increasingly severe.

Construction Examples

J-HD Steel Slitの施工例
J-HD Steel Slitの施工例
J-HD Steel Slitの施工例
J-HD Steel Slitの施工例
J-HD Steel Slitの施工例
J-HD Steel Slitの施工例
J-HD Steel Slitの施工例
J-HD Steel Slitの施工例
J-HD Steel Slitの施工例
J-HD Steel Slitの施工例

Disaster Prevention Collection

J Slit Dam

Steel permeable dam for capturing debris flows and driftwood

J-HD Steel Slit

Driftwood capturing works that can be retrofitted to existing impermeable sabo dams

JD Fence

Steel permeable debris flow/driftwood capture work installed in no-flow mountain streamsIt is installed along the roadside in mountainous areas.

JSN Steel-Wall Dam

Steel dam utilizing plasticized and compacted sabo soil cement

JS Package

Panel-type gabion work for a permanent structure that takes advantage of the superior features of conventional basket work

JFE Large-scale Gabion Work

Panel-type gabion work with enhanced rigidity of simple steel basketsPermanent structure that takes advantage of the superior features of conventional gabion work

JFE Gabion Work (M Package)

Gabion work using rigid welded wire netCan be applied to a greening method by combined use with a vegetation sheet

JFE Rockfall Protection Fence

A simple rockfall protection fence consisting on H-steel posts, wire ropes, and wire netDeformation of the fence absorbs the energy of a collision.

JFE Rockfall Protection Netting

Guide- and standby-type rockfall protection methodTwo types of products are available.

Tsunami Barrier

Structure designed for capturing drifts caused by tsunami

Contact Information for Inquiries Regarding This Product

J-HD Steel Slitに関するご質問・ご要望などがございましたら、下記よりお気軽にお問い合わせください。

If you have any questions, inquiries, or requests regarding J-HD Steel Slit, please feel free to contact us using the details provided below

JFE Metal Products Corporation

11F, Shinagawa Season Terrace, 1-2-70 Konan, Minato-ku, Tokyo